ESA’s Mike Steinkopf just emailed in with news on today’s air delivery:

View showing the gas & water delivery control panel mounted inside ATV and accessible to the crew.

View showing the gas & water delivery control panel mounted inside ATV and accessible to the crew.

We just got the confirmation from crew that the ISS repressurization (air delivery) is complete.

The initial cabin pressure of 732 mm Hg was increased by 10 mm Hg to 742 mm Hg during two hours of operation using the ATV air tank to deliver a fresh breeze for the weekend.