Replay of the ESATV clip reporting live from ESOC’s Main Control Room for the second Go/NoGo decision – confirming that Rosetta was in good health and that the commands to control the delivery sequence were ready for upload – taken at 01:00 CET on 12 November. Speaker is Rosetta Spacecraft Operations Manager Sylvain Lodiot.