This sent in late this afternoon by Charlotte Beskow from Kourou, where ATV-5 fuelling has been underway – Ed.
UDMH loading has finished! 150 kg of UDMH have now been loaded into each of the two tanks. The next step will be the clean-up followed by the set up for NTO (nitrogen tetroxide) loading.
– Charlotte
Discussion: no comments