The most recent mission report was issued by ATV-CC, Toulouse, last week. The ‘newest’ bit of news is ATV-4 undocking, now set for 28 October. Reentry is planned for 2 November. We’ll dig out further details and get a more detailed blog post out to you later.
Note as always: All dates/timings below are forecast only and are subject to change as this is a continuing, dynamic mission. Time below indicated in UTC.
GENERAL STATUS
- ATV Operations nominal
- Cabin fan switched Off
ATV STATUS
- Attached dormant mode
ATV-CC STATUS and ATV GROUND SEGMENT
- All ATV-CC systems nominal
- ATV monitoring and routine attached activities
CARGO and FUEL STATUS
- Dry cargo : 2 489kg /100% transferred
- Accepted trash : 1238kg
- Accepted liquid waste : 350 l
- Water : 564 Kg /100% transferred
- Air (2 tanks) : 7.2kg available (transferred 59.1kg/89%)
- Oxygen (1 tank): 33.3kg/100% transferred
- Refuelling propellant : initial 860kg, 100% transferred
EXECUTED OPERATIONS
- 29 September: Orbital D1 berthing
- 2 October: Reboost #5
NEXT OPERATIONS. MAIN ACTIVITIES
- 04 October: Liquid Waste Transfer
04 October: Air Mix Transfer
09 October: Liquid Waste Transfer (tbc)
22 October: Orbital D1 unberthing
23 October: Reboost #6
28 October: ATV4 undocking
Discussion: no comments