The most recent mission report was issued by ATV-CC, Toulouse, last week. The ‘newest’ bit of news is ATV-4 undocking, now set for 28 October. Reentry is planned for 2 November. We’ll dig out further details and get a more detailed blog post out to you later.

Note as always: All dates/timings below are forecast only and are subject to change as this is a continuing, dynamic mission. Time below indicated in UTC.

GENERAL STATUS

  • ATV Operations nominal
  • Cabin fan switched Off

ATV STATUS

  • Attached dormant mode

ATV-CC STATUS and ATV GROUND SEGMENT

  • All ATV-CC systems nominal
  • ATV monitoring and routine attached activities

CARGO and FUEL STATUS

  • Dry cargo : 2 489kg /100% transferred
  • Accepted trash : 1238kg
  • Accepted liquid waste : 350 l
  • Water : 564 Kg /100% transferred
  • Air (2 tanks) : 7.2kg available (transferred 59.1kg/89%)
  • Oxygen (1 tank): 33.3kg/100% transferred
  • Refuelling propellant : initial 860kg, 100% transferred

EXECUTED OPERATIONS

  • 29 September: Orbital D1 berthing
  • 2 October: Reboost #5

NEXT OPERATIONS. MAIN ACTIVITIES

  • 04 October: Liquid Waste Transfer
    04 October: Air Mix Transfer
    09 October: Liquid Waste Transfer (tbc)
    22 October: Orbital D1 unberthing
    23 October: Reboost #6
    28 October: ATV4 undocking