All quiet with ATV in space this week! Air transfer to ISS planned for Friday.

Note as always: All dates/timings below are forecast only and are subject to change as this is a continuing, dynamic mission. Time below indicated in UTC.

GENERAL STATUS

  • ATV Operations nominal
  • Cabin fan switched Off

ATV STATUS

  • Attached dormant mode,

ATV-CC STATUS and ATV GROUND SEGMENT

  • All ATV-CC systems nominal
  • ATV monitoring and routine attached activities

CARGO and FUEL STATUS

  • Dry cargo : 2 489kg /100% transferred
  • Accepted trash : 1238kg
  • Accepted liquid waste : 328 l
  • Water : 564 Kg /100% transferred
  • Air (2 tanks) : 13.8kg available (transferred 52.5kg/79%)
  • Oxygen (1 tank): 33.3kg/100% transferred
  • Propellant : used 1246kg, available for ISS supports : 2236kg
  • Refuelling propellant : initial 860kg, 100% transferred

EXECUTED OPERATIONS

  • 15 September: Reboost  0.50m/s
  • 16 September: Thruster T402 firing test
  • 19 September: Thruster T402 re-integration
  • 19 September: Liquid Waste Transfer
  • 19 September: Air Mix Transfer

NEXT OPERATIONS. MAIN ACTIVITIES

  • 22 September: Orbital D1 berthing (Delayed)
  • 25 September: ISS attitude change
  • 26 September: 36 docking (bu 27/28). ISS attitude change
  • 27 September: Air Mix Transfer
  • 01 October: Liquid Waste Transfer (tbc)
  • 02 October: Reboost (placeholder. 2.34m/s, bu 04Oct)
  • 04 October: Liquid Waste Transfer (tbc)
  • 04 October: Air Mix Transfer (tbc)
  • 22 October: Orbital D1 unberthing