Quick update on ATV-4: Successful reboost to the ISS on 31 August; final O2 transfer to station on 5 September and, today, air transfer today and ATV configured for the Soyuz thruster test.
Note as always: All dates/timings below are forecast only and are subject to change as this is a continuing, dynamic mission. Time below indicated in UTC.
GENERAL STATUS
- Successful reboost on 31 August and final O2 transfer on 05 Sept
- ATV nominal
ATV STATUS
- Attached dormant mode,
ATV-CC STATUS and ATV GROUND SEGMENT
- All ATV-CC systems nominal
- ATV monitoring and routine attached activities
CARGO and FUEL STATUS
- Dry cargo : 2 489kg /100% transferred
- Accepted trash : 1234kg
- Accepted liquid waste : 328 l
- Water : 564 Kg /100% transferred
- Air (2 tanks) : 33.4kg available (transferred 33kg/50%)
- Oxygen (1 tank): 33.3kg/100% transferred
- Propellant : used 1177kg, available for ISS supports : 2 308kg
- Refuelling propellant : initial 860kg, 100% transferred
EXECUTED OPERATIONS
- 30 August : Air transfer (around 14kg)
- 31 August : Reboost 0.48m/s
- 03 September: ATV-05 ATVCC-Bremen SVT-1 successful
- 04 September: Liquid waste transfer
- 05 September: O2 final transfer (fan ON)
- 05 September: Liquid waste transfer
- 06 September: ATV in configuration for Soyuz thruster test
NEXT OPERATIONS. MAIN ACTIVITIES
- 06 September: Air transfer
- 10 September: 34S undocking
- 12 September: Reboost (bu 14Sept) 0.47m/s
- 13 September: Air transfer
- 19 September: Air transfer
- 19 September: Liquid waste transfer tbc
- 22 September: Orbital D1 berthing
- 25 September: ISS attitude change
- 26 September: 36 docking (bu 27/28). ISS attitude change
- 02 October: Reboost (placeholder. 2.34m/s, bu 04Oct)
- 22 October: Orbital D1 unberthing