Now live in ESA web:

A routine inspection has concluded that additional measures are required to ensure the maximum readiness of the third Automated Transfer Vehicle for launch. It has therefore been decided to postpone the launch previously scheduled for 9 March.

A new launch date will be announced as soon as possible.

Full text via ESA PR