ATV2 Reboost: A one-burn reboost of ISS is scheduled today at 2:00 EDT (07:00 CET) using the ATV OCS (orbital control system) thrusters. Planned burn duration: 14 min 43 sec; delta-V (increase in velocity): 2.16 m/s (7.09 ft/s). Expected mean altitude gain: 3.7 km (2 nmi). Purpose: Set up phasing for the Soyuz 26S and ULF6 launches.

Via NASA – ISS on-orbit status 17 March