Metop-B to be handed over

Handover to Eumetsat is set to take place at 18:00 CEST today. At 14:45 today, the extended mission operations 'team of teams' at ESA gathered in the Main Control Room to witness the addition of the successful launch and LEOP for Metop-B to the history board running across the top of the back wall.

Adding Metop-B to the launch wall in ESOC's Main Control Room, 20 September 2012. Credit: ESA

Adding Metop-B to the launch wall in ESOC's Main Control Room, 20 September 2012. Credit: ESA

A great tradition. Sweet!

About Daniel

Daniel Scuka is Senior Editor for Spacecraft Operations at ESOC, ESA's European Space Operations Centre, Darmstadt, Germany.
This entry was posted in MetOp and tagged , , . Bookmark the permalink.

2 Responses to Metop-B to be handed over

  1. Perlik says:

    Wrong information....
    Handover to EUMETSAT not yet done, it shall take place at 18h00 local !!!!